Power & PropulsionControllable Pitch PropulsionBrunvoll Propulsion for Two Chemical Tankers

Brunvoll Propulsion for Two Chemical Tankers

Brunvoll has signed a contract with Tersan Shipyard for the delivery of propulsion and manoeuvring systems for two stainless steel chemical product tankers. Tune Chemical Tankers (TCT), which also is a part of Tersan Group will be the owner of the vessels. The contract also includes an option for two additional vessels.

Brunvoll’s delivery for the vessels consists of a complete shaft line solution with a reduction gearbox and a controllable pitch propeller, a tunnel thruster, Brunvoll Propulsion and Thruster Control system, BruCon PTC.

The reduction gearbox features both Power-Take-In (PTI), and Power-Take-Out (PTO). This solution provides a versatile platform to optimize for the lowest possible fuel consumption, and at the same time provide good performance during manoeuvring operations. The gearbox has a front-mounted clutch for enabling fully electric propulsion and provides a take-me-home functionality. The gearbox also has a clutch for the propulsion line, enabling the main engine and PTO can be utilized as a generator set when the vessels are in port.

‍Tune Chemical Tankers (TCT) is a global tanker operator with its headquarters in Rotterdam, Netherlands. TCT is a part of Tersan Group, which Tersan Shipyard also is a part of. TCT operates a young fleet consisting of 18 chemical tankers.

The vessels are designed by Norden Ship Design House, based in Istanbul, Turkey. The vessels will have an overall length of approximately 150 meters and will have a loading capacity of 16.500 deadweight tonne.
‍
“What does it say when the shipbuilder, Tersan, who also happens to be the ship owner, chooses Brunvoll? Well, it makes me believe that they have seen the long-term cost benefit of choosing a company that delivers excellent quality and service, over the vessel’s life span. We wish to thank Tersan and Norden for the cooperation on these projects and I hope to maybe see the vessels delivering chemicals to one of our local producers of styrofoam one day”, says Per Endre Woldsund, Sales Manager at Brunvoll.

The shaft line solution for the chemical tankers consists of a controllable pitch propeller, a reduction gearbox, and a PTO/PTI module with a clutch. The main engine is not part of the Brunvoll’s delivery.

Latest News

Svitzer has taken delivery of another TRAnsverse 2900 tug from Cheoy Lee shipyard

Svitzer Takes Delivery of Another TRAnsverse 2900 Tug

The latest TRAnsverse 2900 tug delivery from Cheoy Lee’s Hin Lee shipyard adds to Svitzer’s expanding fleet as its 27-vessel newbuild programme continues to...
GONDAN Shipbuilders has secured a contract with AB Göteborg-Styrsö Skärgårdstrafik (Styrsöbolaget) to design and build three fully electric passenger catamarans for operation in Gothenburg’s southern archipelago.

GONDAN Wins Contract for Gothenburg Electric Ferries

The contract forms part of Styrsöbolaget’s long-term passenger transport commitment in Gothenburg’s southern archipelago, supporting the transition to fully electric ferry operations GONDAN Shipbuilders has...
Built by Uzmar Shipyard for Norwegian operator Buksér og Berging, the Bryteren is a compact ice-class tug designed to support ship-assist, towing and ice-management operations in demanding northern waters. Based on Robert Allan Ltd.’s TundRA 2200 design, the tug combines powerful towing capability with enhanced manoeuvrability and specialised cold-weather features, enabling it to operate reliably in challenging ice conditions.

New Ice-Class Tug ‘Bryteren’ Delivered to Buksér og Berging

Designed for operation in temperatures down to -25°C, the tug 'Bryteren' combines icebreaking capability, specialised winterisation and powerful propulsion Built by Turkish shipbuilder Uzmar Shipyard...
Muir Mhòr Offshore Wind Farm has secured offshore planning consent from the Scottish Government, paving the way for one of the world’s first commercial-scale floating offshore wind farms to be developed in Scottish waters. The approval marks a significant milestone for the flagship ScotWind project, which is planned for Scotland’s east coast, approximately 63km from Peterhead.

Scottish Floating Wind Farm Project Gets Green Light

The project has now received the green light, with both offshore and onshore planning approvals secured, paving the way for development of one of...

Related news