Power & PropulsionElectricCorvus Energy Blue Whale ESS awarded RINA Type Approval

Corvus Energy Blue Whale ESS awarded RINA Type Approval

Corvus Energy announce they have received Type Approval from RINA for its large-scale marine energy storage system, the Blue Whale ESS.

RINA Type Approval confirms that the Blue Whale ESS complies with RINA Rules for the Certification of Lithium Battery Systems. This approval, along with recently awarded type approval from DNV, demonstrate that the large-scale energy storage system complies with the most stringent rules, regulations, and safety requirements in the industry, as defined by leading maritime class societies.

The result of a multi-million-dollar development program, the Blue Whale ESS is designed specifically for large vessels, like Cruise Ships, Ro-Pax and Service Operation Vessels (SOV), and vessels that require a large amount of energy.

The Blue Whale design incorporates the unsurpassed safety features of the Corvus Orca ESS, the world`s most installed marine energy storage system, along with additional features that make it better equipped to meet the energy demands of large vessels.

For example, optimised energy density enables the Blue Whale to deliver more power. This in turn can extend the vessel’s ability to achieve and maintain zero-emission operations, including during transit through emissions-restricted zones and port stays.

— “We’re pleased that the Blue Whale ESS design has now received type approvals from both RINA and DNV, meeting the highest safety standards in the industry,” says Fredrik Witte, CEO of Corvus Energy.

He adds, “a large-scale battery system designed to meet the energy demands of larger vessels, including cruise ships and large passenger and vehicle transport vessels, is key to support the advancement of maritime decarbonisation and emissions reduction efforts.”

In addition to securing type approval from RINA and DNV, Corvus Energy is currently pursuing type approval from BV and ABS for the Blue Whale ESS.

Both the RINA and DNV Type Approvals for the Blue Whale ESS include approval of the production facility where the Corvus Blue Whale product is produced, which is located in Canada outside of Vancouver. More than fifteen Blue Whale orders, cumulatively totalling over 95 MWh, are already confirmed for delivery in 2024, 2025 and 2026, and the production facility is scaled for future capacity needs.

Latest News

Kristiansand Municipality in Norway has taken delivery of SGT Drengen, an 11-metre ProZero Mission Master workboat built for the Norwegian Archipelago Service. The vessel is the third ProZero workboat delivered to the service and was handed over to its crew in Kristiansand.

ProZero Delivers ‘SGT Drengen’ to Norway

The 11-metre Mission Master, 'SGT Drengen', features an open working deck and bow ramp to support daily operations across the Norwegian archipelago Kristiansand Municipality in...
Royal IHC and Nauplius Workboats have signed a contract to jointly develop a new portfolio of heavy-duty workboats designed to support dredging operations using Royal IHC’s Beaver® cutter suction dredgers.

Royal IHC and Nauplius Partner on New Workboat Series

The new multi-purpose workboat series will support Royal IHC’s Beaver® cutter suction dredgers, with capabilities including towing, anchor handling and personnel transport Royal IHC and...
French Customs is operating two Sillinger 820 ALURAID rigid-hulled inflatable boats (RHIBs), powered by twin OXE300 diesel outboard engines supplied by KENT Marine Equipment, the French distributor for OXE Marine.

Case Study – OXE300 Engines Power French Customs RHIBs

The Sillinger 820 ALURAID combines a robust aluminium hull with diesel propulsion, fuel flexibility and high electrical output for French Customs operations French Customs is...
Ocergy has achieved two major milestones, confirming the commercial readiness of its OCG-Wind 3MW floating wind platform and OCG-Data environmental monitoring buoy as the company prepares to scale its offshore solutions.

Ocergy Marks Major Milestone for Floating Wind Platform

Ocergy confirms commercial readiness for two offshore technologies following the successful deployment of its floating wind platform and the continued operation of its environmental...

Related news