Renewable EnergyOffshore WindEcowende contracts Van Oord to build most ecological wind farm yet

Ecowende contracts Van Oord to build most ecological wind farm yet

Ecowende is pleased to confirm that Van Oord has been contracted for the construction of the offshore wind farm Hollandse Kust (west) lot VI. Ecowende, a joint venture of Shell and Eneco, is determined to contribute to a sustainable future for offshore wind that positively contributes to the North Sea’s ecology.

As Ecowende’s contractor, Van Oord will be responsible for transporting and installing the foundations. Van Oord will also lay, connect and bury the cables between the wind turbines. Finally, Van Oord will be handling the transportation and installation of the wind turbines at sea.

Society needs offshore wind projects to meet its renewable energy targets

Building wind farms in harmony with nature is an important condition for eventually achieving these targets. Besides reducing the negative impact of an offshore wind farm, it is also necessary to implement ecological measures that can contribute to the development of wind farms with a net-positive impact. Ecowende and Van Oord will collaborate on implementing various innovations, large-scale mitigations and stimulating ecological measures. In addition, the parties will join forces in various feasibility studies and solution developments.

Noise mitigation

Van Oord will deploy its brand-new offshore installation vessel Boreas, currently being built, for the transport and installation of the foundations and turbines. To minimise the noise of the construction of the wind farm, Van Oord will deploy an alternative installation method for the foundations. A vibro hammer, using vibrations will drive the monopiles to their required depths. This will be the first large scale implementation of this innovative technique at a Dutch offshore wind farm. Van Oord’s cable laying vessel Nexus will be deployed for the installation of the connecting inter-array cables between the wind turbines.

Eco-friendly scour protection

The installation of scour protection is required to avoid the effects of erosion. This is achieved by high precision rock installation around the foundations. Van Oord has advised Ecowende on nature enhancing components in the design of the scour protection to help stimulate a diverse habitat for marine life. One of Van Oord’s flexible fallpipe vessels will be deployed to accurately and efficiently install the eco-friendly scour protection.

© Images and copy in collaboration with Van Oord

Latest News

Siem Industries has placed an order with China’s Fujian Mawei Shipbuilding for two Offshore Subsea Construction Vessels (OSCVs), strengthening its presence in the offshore subsea sector.

Siem Orders Two Offshore Subsea Construction Vessels

Fujian Mawei Shipbuilding will construct the two specialised Offshore Subsea Construction Vessels to a design developed in collaboration with Sirius Design & Integration and...
CBED has expanded its offshore wind support fleet with the acquisition of the Commissioning Service Operation Vessel (CSOV) Wind Dedication, formerly Seaway Moxie, from international offshore wind contractor Seaway7.

CBED Acquires CSOV from Seaway7

The newly acquired CSOV becomes the fourth vessel in CBED’s fleet, strengthening its offshore wind support capabilities CBED has expanded its offshore wind support fleet...
Safehaven Marine has signed a contract with Montevideo-based pilotage operator NEWLAR S.A. for the construction of an 18m Interceptor 60 Pilot vessel, marking the companies’ second newbuild agreement.

Safehaven Marine Wins Uruguay Pilot Boat Order

The contract will mark Safehaven Marine’s sixth Interceptor 60 Pilot and its 70th pilot boat delivered worldwide Safehaven Marine has signed a newbuild contract with...
MEYER RE has secured a contract to modernise the propulsion system of Frisia I, an island ferry operated by German ferry company AG Reederei Norden-Frisia, converting the vessel to hybrid propulsion. The contract was signed in Norddeich, Germany, on 22 October 2026.

MEYER RE Secures ‘Frisia I’ Hybrid Conversion

MEYER RE will upgrade 'Frisia I' with hybrid propulsion technology, targeting annual CO₂ emission reductions of up to 400 tonnes MEYER RE has secured a...

Related news