Ship & Boat BuildingDredgingElectrical Installation Awarded for new Beagle 10.2 TSHD Dredger

Electrical Installation Awarded for new Beagle 10.2 TSHD Dredger

Contract supports construction of Royal IHC–designed TSHD for The Dutra Group

Royal Van der Leun, a global specialist in maritime technical solutions, has been awarded the contract for the complete electrical installation package of a Beagle® 10.2 trailing suction hopper dredger (TSHD), developed by Royal IHC for The Dutra Group.

The Beagle® 10.2 TSHD is based on Royal IHC’s proven Beagle® design and delivers a combination of efficiency, reliability and future-ready performance.

The TSHD Dredger, to be named Adele, is currently under construction at Eastern Shipbuilding Group, Inc. in the United States. Upon completion, it will join The Dutra Group’s existing dredging fleet alongside the TSHD Stuyvesant.

Designed for a wide range of operations, the new Beagle® will support maintenance dredging, capital deepening projects, coastal restoration, storm recovery and beach nourishment across the United States.

This project represents another milestone in the long-standing collaboration between Royal Van der Leun and Royal IHC, reinforcing a partnership built on technical expertise, reliability and trust.

Royal Van der Leun is responsible for the complete electrical engineering and system integration of the vessel.

The scope of supply includes, among others :

  • System integration and electrical engineering
  • Main, emergency and auxiliary switchboards
  • MCC cabinets and distribution panels
  • Frequency drives for jet pumps and bow thruster
  • Indoor and outdoor lighting systems (120 VAC)
  • Navigation and dredging lights
  • Integrated communication system and central antenna system
  • Control solutions for windlass, capstan and dredge pump installation
  • Safety and emergency stop systems
  • Shore supply, welding connection boxes and searchlights

“All over the world, we support the construction of high-quality vessels by delivering reliable electrical solutions. This project reflects what we stand for: long-term partnerships, engineering excellence, and the shared ambition to build exceptional ships together with trusted partners such as Royal IHC.” — Lennart Ames, Account Manager, Royal Van der Leun

Latest News

MAKEEN Signs mtu Series 2000 Production Agreement

MAKEEN Signs mtu Series 2000 Production Agreement

The agreement combines established mtu high-speed engine technology with MAKEEN’s investment in Saudi manufacturing infrastructure Rolls-Royce Power Systems and Saudi Arabian industrial company MAKEEN have...
CSL OWL SRI, a partnership between The CSL Group and Offshore Wind Logistics, has launched MV Rock Star, the first of two purpose-built subsea rock installation vessels developed to support the growing offshore renewable energy sector.

CSL OWL SRI Launches MV Rock Star for Subsea Rock Installation

MV Rock Star is designed for scour protection, cable burial and subsea rock installation in water depths of up to 100 metres CSL OWL SRI,...
Louisiana-based Metal Shark has secured a U.S. Government contract to build 13 Defiant-class patrol boats for Vietnam, with options for additional vessels. The new contract builds on Metal Shark’s previous delivery of 24 purpose-built 45 Defiant military patrol boats to the Vietnam Coast Guard between 2017 and 2020.

Metal Shark Secures New Patrol Boat Order for Vietnam

Latest contract builds on the delivery of 24 Metal Shark 45 Defiant patrol boats to the Vietnam Coast Guard Louisiana-based Metal Shark has secured a...
Belgium-based underwater ship repair specialist Hydrex has completed an underwater stern tube seal replacement on a 180-metre container ship in Algeciras, allowing the vessel to remain afloat and avoid a costly drydock visit.

Hydrex Completes 48-Hour Stern Tube Repair

Hydrex completed the critical underwater Stern Tube repair in just under 48 hours, avoiding the need for a costly drydock visit Belgium-based underwater ship repair...

Related news