Ship & Boat BuildingPatrol BoatsFirst Canadian Coast Guard Arctic Patrol Ship Donjek Launched

First Canadian Coast Guard Arctic Patrol Ship Donjek Launched

Irving Shipbuilding completes launch of inaugural Coast Guard Arctic Patrol Ship

The Canadian Coast Guard’s first Arctic and Offshore Patrol Ship (AOPS), the future CCGS Donjek, was successfully launched on April 28, 2026, at Irving Shipbuilding’s Halifax Shipyard. The milestone marks the delivery of the first AOPS built specifically for the Canadian Coast Guard under Canada’s National Shipbuilding Strategy (NSS), representing a key step in the long-term renewal of the agency’s fleet.

The 104.7-metre vessel was transferred from the yard’s land-level construction facility onto a submersible barge on April 27, before being floated off into the Bedford Basin late on April 28.

The future CCGS Donjek is now pier side at Halifax Shipyard where work continues in preparation for sea trials and delivery to the Canadian Coast Guard later this year.

Halifax Shipyard continues build progress on the second and final Arctic and Offshore Patrol Ship for the Canadian Coast Guard, the future CCGS Sermilik, with work advancing as scheduled.

The Canadian Coast Guard’s AOPS variants will be tasked with a wide range of missions. Both ships will operate as the Canadian Coast Guard’s primary platform with increased capabilities to support fisheries enforcement on Canada’s east coast support search and rescue and icebreaking operations, while strengthening Canada’s presence in the Arctic during the summer.

Preceding the Canadian Coast Guard AOPS variants, Irving Shipbuilding delivered six Harry DeWolf-class AOPS to the Royal Canadian Navy, leading the revitalisation of the Royal Canadian Navy’s fleet. The success of the AOPS program is a clear reflection of the NSS’s impact, demonstrating how strategic investment in domestic shipbuilding strengthens national capabilities and supports Canadian sovereignty on the global stage. This work directly contributes to delivering quality ships to the Canadian Coast Guard, and the progress made thus far on Canada’s new combatant ship, the River-class Destroyer (RCD).

After starting full rate production on the RCD project in April 2025, progress on the first RCD, the future HMCS Fraser, is steadily advancing with keel laying taking place in June 2026.

Since the NSS was announced, Irving Shipbuilding has developed a world-class workforce, modernized facilities, built a sovereign shipbuilding capability, and established a coast-to-coast-to-coast supply chain. With six AOPS delivered to the Royal Canadian Navy, two AOPS for the Canadian Coast Guard underway, and 15 RCD for the Royal Canadian Navy ahead, Irving Shipbuilding is proud to be Canada’s National Shipbuilder, helping build Canada’s future.

“Through the National Shipbuilding Strategy, we are building more than ships — we are building industrial capacity in Canada. This is a long-term investment in sovereign capability, in Canadian workers, and in the resilience of our domestic supply chains. From shipyards to suppliers across the country, this work is creating and sustaining thousands of skilled jobs, while ensuring Canada has the ability to build and maintain the vessels it depends on. This is how we strengthen both our economy and our national capacity at the same time.” – The Honourable Joël Lightbound, Minister of Government Transformation, Public Works and Procurement and Quebec Lieutenant

“The launch of the CCGS Donjek is a major advancement for the Canadian Coast Guard. With modern capabilities and a shared class with the Royal Canadian Navy, this vessel will deepen our collaboration at sea and expand our ability to support fisheries patrols, conservation and protection, provide humanitarian assistance, and serve coastal and northern communities with reliability, flexibility, and care – wherever our personnel is needed.” – Kevin Brosseau, Commissioner of the Canadian Coast Guard

“With the launch of the future CCGS Donjek, we have achieved another major milestone in our commitment to building quality ships for Canada. This achievement is driven by the dedication and teamwork of our people and further highlights Irving Shipbuilding’s role as Canada’s National Shipbuilder.” – Dirk Lesko, President, Irving Shipbuilding Inc.

Latest News

Svitzer has taken delivery of another TRAnsverse 2900 tug from Cheoy Lee shipyard

Svitzer Takes Delivery of Another TRAnsverse 2900 Tug

The latest TRAnsverse 2900 tug delivery from Cheoy Lee’s Hin Lee shipyard adds to Svitzer’s expanding fleet as its 27-vessel newbuild programme continues to...
GONDAN Shipbuilders has secured a contract with AB Göteborg-Styrsö Skärgårdstrafik (Styrsöbolaget) to design and build three fully electric passenger catamarans for operation in Gothenburg’s southern archipelago.

GONDAN Wins Contract for Gothenburg Electric Ferries

The contract forms part of Styrsöbolaget’s long-term passenger transport commitment in Gothenburg’s southern archipelago, supporting the transition to fully electric ferry operations GONDAN Shipbuilders has...
Built by Uzmar Shipyard for Norwegian operator Buksér og Berging, the Bryteren is a compact ice-class tug designed to support ship-assist, towing and ice-management operations in demanding northern waters. Based on Robert Allan Ltd.’s TundRA 2200 design, the tug combines powerful towing capability with enhanced manoeuvrability and specialised cold-weather features, enabling it to operate reliably in challenging ice conditions.

New Ice-Class Tug ‘Bryteren’ Delivered to Buksér og Berging

Designed for operation in temperatures down to -25°C, the tug 'Bryteren' combines icebreaking capability, specialised winterisation and powerful propulsion Built by Turkish shipbuilder Uzmar Shipyard...
Muir Mhòr Offshore Wind Farm has secured offshore planning consent from the Scottish Government, paving the way for one of the world’s first commercial-scale floating offshore wind farms to be developed in Scottish waters. The approval marks a significant milestone for the flagship ScotWind project, which is planned for Scotland’s east coast, approximately 63km from Peterhead.

Scottish Floating Wind Farm Project Gets Green Light

The project has now received the green light, with both offshore and onshore planning approvals secured, paving the way for development of one of...

Related news