Renewable EnergyOffshore WindFred. Olsen Windcarrier awarded turbine installation contract for Baltic Eagle offshore wind...

Fred. Olsen Windcarrier awarded turbine installation contract for Baltic Eagle offshore wind farm

Fred. Olsen Windcarrier (FOWIC) has been awarded a contract directly by Vestas Wind Systems (Vestas) for the transportation and installation of 50 Vestas V174-9.5MW wind turbines at the Baltic Eagle offshore wind farm in Germany. The installation works will commence in 2024. This is one of the 3 new transport and installation contracts announced on 28 May 2021.

The jack-up installation vessel Blue Tern will execute the contract and the vessel was nominated for the site due to her ability to operate at deep water sites. The Baltic Sea represents challenging soil conditions which requires significant available leg lengths and jacking experience. Two conditions FOWIC can offer to the Baltic Eagle project, by proposing Blue Tern and having experience from the Wikinger project. 

Dennis Mordhorst, Head of Marine Operations and Vessel Management, Vestas says: “Our collaboration with FOWIC goes back for years and this contract award emphasizes once again our strong partnership. FOWIC brings their proven offshore wind expertise and a highly capable vessel to the Baltic Eagle site and we look forward to a safe and successful project execution.”

“We are extremely proud to win another transport and installation contract directly with Vestas. This contract clearly showcases the diversity and competitiveness of our fleet and our ability to de-risk the execution of a challenging project. We look forward to supporting Vestas and Iberdrola in the Baltic Sea in 2024”, says Casper Toft, CCO, Fred. Olsen Windcarrier.

Our collaboration with FOWIC goes back for years and this contract award emphasizes once again our strong partnership – says Dennis Modhorst, Head of Operations and Vessel Management, Vestas

Baltic Eagle:

Baltic Eagle will be Iberdrola’s second largest offshore wind farm in Germany. With a capacity of 476MW, the wind farm will supply renewable energy to 475,000 households. The wind farm will be in the German Baltic Sea, 30 kilometres from the German island of Rügen.

Categories:

Latest News

Norwegian Electric Systems (NES), a subsidiary of HAV Group ASA, has secured a contract with Zamakona Shipyard Bilbao to deliver a complete power package and system integration for a new live fish carrier being built for Brønnbåt Nord.

NES Secures Power System Order From Zamakona Shipyard

Norwegian Electric Systems will provide propulsion and auxiliary electric drives, power generation, switchboards and power management systems for the live fish carrier being built...
FAIRPLAY TOWAGE Group has signed a contract with Sanmar Shipyards for the construction of six new tugs as part of a major fleet modernisation and expansion programme for FAIRPLAY TOWAGE Polska.

FAIRPLAY TOWAGE Orders Six New Tugs From Sanmar

Six-vessel newbuild programme will add four harbour and terminal tugs and two high-powered offshore tugs to FAIRPLAY TOWAGE Polska’s fleet FAIRPLAY TOWAGE Group has signed...
MacGregor has secured an order from Nantong Rainbow Offshore & Engineering Equipment to equip four Commissioning Service Operation Vessels (CSOVs) with three-dimensional motion-compensated cranes and Horizon gangway systems.

MacGregor Wins Order to Equip Four New CSOVs for IWS Fleet

MacGregor will supply key offshore handling and personnel transfer systems for four Skywalker-class CSOVs joining IWS Fleet MacGregor has secured an order from Nantong Rainbow...
Pinnacle Marine (Singapore) Pte Ltd has launched BARAKA-9, a new B100-compatible aluminium utility boat built for Trans Wave Marine Services, marking the operator’s first move into harbour craft capable of running entirely on biodiesel.

Pinnacle Marine launches B100-compatible BARAKA-9

BARAKA-9 a new aluminium utility boat becomes Trans Wave’s first vessel capable of operating on 100% biodiesel Pinnacle Marine (Singapore) has launched BARAKA-9, a new...

Related news