Ship & Boat BuildingFerriesGebhard Electro receives contract for electrical installation Fast Ferry 4212

Gebhard Electro receives contract for electrical installation Fast Ferry 4212

Damen Shipyards Gorinchem has awarded Gebhard Electro the contract for the supply of electrical installation packages for 2 Fast Ferries.

The installation packages are delivered to Damen Song Cam where the installation will be completed on site. Gebhard Electro will design the complete package which consists of main switchboard, distribution board, ship automation system, fire detection system and cable package.

Gebhard Electro has already completed over 1000+ projects shipped to shipyards around the world. Gebhard’s team provides support for the on-site completion and has commissioning engineers to guarantee the quality of the systems.

Latest News

MAKEEN Signs mtu Series 2000 Production Agreement

MAKEEN Signs mtu Series 2000 Production Agreement

The agreement combines established mtu high-speed engine technology with MAKEEN’s investment in Saudi manufacturing infrastructure Rolls-Royce Power Systems and Saudi Arabian industrial company MAKEEN have...
CSL OWL SRI, a partnership between The CSL Group and Offshore Wind Logistics, has launched MV Rock Star, the first of two purpose-built subsea rock installation vessels developed to support the growing offshore renewable energy sector.

CSL OWL SRI Launches MV Rock Star for Subsea Rock Installation

MV Rock Star is designed for scour protection, cable burial and subsea rock installation in water depths of up to 100 metres CSL OWL SRI,...
Louisiana-based Metal Shark has secured a U.S. Government contract to build 13 Defiant-class patrol boats for Vietnam, with options for additional vessels. The new contract builds on Metal Shark’s previous delivery of 24 purpose-built 45 Defiant military patrol boats to the Vietnam Coast Guard between 2017 and 2020.

Metal Shark Secures New Patrol Boat Order for Vietnam

Latest contract builds on the delivery of 24 Metal Shark 45 Defiant patrol boats to the Vietnam Coast Guard Louisiana-based Metal Shark has secured a...
Belgium-based underwater ship repair specialist Hydrex has completed an underwater stern tube seal replacement on a 180-metre container ship in Algeciras, allowing the vessel to remain afloat and avoid a costly drydock visit.

Hydrex Completes 48-Hour Stern Tube Repair

Hydrex completed the critical underwater Stern Tube repair in just under 48 hours, avoiding the need for a costly drydock visit Belgium-based underwater ship repair...

Related news