Latest NewsShip & Boat BuildingMacduff Ship Design & Tor Group Celebrate Delivery of "Tor Boreas"

Macduff Ship Design & Tor Group Celebrate Delivery of “Tor Boreas”

Macduff Ship Design and Tor Group announce the successful completion and departure of the MV Tor Boreas, a groundbreaking multi-role utility vessel. Having successfully completed all trials and has departed the companies facilities in Tuzla Turkey and is currently in transit to the United Kingdom.  ‘Tor Boreas’ represents both a new class of vessel for Tor Group and a new way of building, utilising modular assembly to enable more time off the slipway in a purpose-built facility. Tor Group see a great future both for this initial vessel and others of her class.

Tor Boreas is a cutting edge utility service vessel with an ability to support multiple industries but with specific ability to conduct a large range of tasks within the offshore wind sector.  The vessel is designed below 24m registered length to allow it to operate under UK MCA workboat code edition III regulations but has also been built to Bureau Veritas regulations and approval to allow for international operation.

The vessel has many innovative features which combined into a vessel of this size offers a ground breaking vessel.  Tor Boreas is driven by a diesel electric power train to ensure optimal efficiency and this combined with the tier III engine exhaust system gives reduced emissions during operation compared to a conventional diesel driven vessel.  3 MAN D2676 main generators each rated at 340 ekw, 400 V, 50 Hz supply electricity to the main control systems.  The electric drive motors are connected to twin Schottel SRP 210 FP azimuth drives which when combined with the Veth VT-90 bow thruster gives high levels of manuverability with full Dynamic Positioning capability.  As an addition to this the vessel also has a 4 point mooring anchoring arrangement onboard to allow for longer term station keeping.

In conjunction with the station keeping abilities the vessel is also fitted with a Gyro Stabilisation system supplied by Veem.  This system significantly reduces vessel motions for both crew comfort and allows service operations to be conducted in higher sea states than would normally be possible.

The vessel is arranged with numerous items of deck equipment to allow for multiple different operations.  These include a Melcal, 5 T hydraulic ‘A’ Frame at the stern, a Melcal, KT 120T3 offshore crane is arranged to starboard aft to cover the entire working deck and to work over the starboard side with an optional boulder grappling attachment.  Midships on the main deck is a 25 T electric towing winch which can be used for towage or work over the stern, utilising the 500 mmm diameter 30 T stern roller.

To give additional flexibility to underwater operations a 1500mm x 1500mm moon pool is arranged which can work with either the ‘A’ Frame or the crane.  The main deck also has 75 square metres of usable deck space and an ability to carry up to 60 Tonnes of deck cargo or 3 x 20 foot containers, and is arranged with modular installation for dive and survey support units.

Below deck the vessel is split into 6 compartments to allow it to meet single compartment flooding requirements.  These consist of, Fore peak, Crew accommodation space with 2 x twin cabins with ensuite facilities, Passenger accommodation space with 6 x twin cabins with ensuite facilities,  Generator room with the 3 main generators, gyrostabilisation unit and sewage plant, Switchboard room, Propulsion room.

Forward of the working deck at main deck level are crew and passenger day facilities with dry locker and changing room, workshops, laundry, provisions locker, galley, mess area, lounge and TV lounge.

On Forecastle deck a full width casing contains, HVAC room, Harbour set / emergency generator space, Electronics room, divers control room, embarkation lobby and 2 x single officers cains with ensuite facilities.  Forward of this area is the open fore deck with the forward mooring winches.  Aft of the casing a 4m RHIB is arranged for rescue operations launched utilising the main crane.

The wheelhouse is arranged with al round visibility including full height windows aft to provide excellent visibility of the aft working deck.  The wheelhouse has a main forward command position and an auxiliary station aft.  There is also a communal area to port with small pantry area.

With the ability to carry 70m3 of fuel and over 35m3 of freshwater, combined with the onboard sewage treatment system the vessel has the ability to stay at sea for an extended period.

We are thrilled to have been part of this project which showcases the abilities of both Tor Group as builders and Macduff ship Design as designers to develop and build such an innovative and complex vessel within a relatively compact length.

Kemal Torlak, Tor Group’s CEO, said, “It’s been a challenging build with the supply chain disturbances from Covid-19 still evident across the sector, but we are delighted with TOR BOREAS.  She represents both a new class of vessel for Tor Group and a new way of building, utilising modular assembly to enable more time off the slipway in a purpose-built facility.  We see a great future both for this initial vessel and others of her class.”

Classification:

  • Bureau Veritas – BV I + HULL • MACH, Wind Farm Service Ship – M2, Tug standardized bollard pull 15 tons, Unrestricted Navigation, • AUT-UMS, • DYNAPOS AM/AT
  • MCA – Workboat code III – Area of operation Category 0
  • Length overall: 26.95 m
  • Length Registered: 23.95 m
  • Beam: 11.00 m
  • Depth: 4.35 m
  • Maximum operational draft 3.50 metres
  • Maximum operational displacement: 625 tonnes
  • Freshwater capacity: ≈ 30 m3
  • Oil fuel capacity: ≈ 70 m3
  • Speed: 11.0 knots
  • Bollard pull 17.0 Tonnes
  • Crew: 6 person
  • Passenger: 12 person

Latest News

YANMAR Marine International has launched its new YF12e Hybrid system, an integrated propulsion and onboard power solution designed to support more sustainable operations across the 40–50ft displacement vessel market.

YANMAR Unveils New Hybrid Propulsion Package

YANMAR's latest hybrid solution features integrated power management and up to 12.1kWe of electric propulsion YANMAR Marine International has launched its new YF12e Hybrid system,...
DEME has awarded DEMCON unmanned systems a contract for the construction of two offshore unmanned surface vessels (USVs), based on the company’s DUS OV platform, as it expands its capabilities in remote and autonomous offshore survey operations.

DEMCON Secures DEME Order for Two USVs

Based on DEMCON’s DUS OV platform, the two USVs will feature integrated mission management, collision avoidance and remote operations capabilities DEME has awarded DEMCON unmanned...
BOURBON has taken delivery of the first of two new-generation Surfer 341 crewboats following successful sea trials, with Grandweld Shipyards officially handing over the 34-metre vessel at its Dubai shipyard on 3 November 2026. Designed by French naval architecture firm MAURIC, the Surfer 341 represents the latest development in BOURBON’s high-speed offshore personnel transportation fleet and continues a partnership between the two companies that spans more than 26 years.

Grandweld Delivers First Surfer 341 to BOURBON

The 34-metre Surfer 341 Crewboats, designed by MAURIC and built by Grandweld Shipyards, accommodates up to 60 offshore personnel and delivers service speeds exceeding...
The Marine Nuclear Propulsion System (MarNuPS) Pilot project has secured NOK 20 million (approximately USD 2 million) in initial funding from the Research Council of Norway, supporting the next phase of development as the consortium moves towards the physical integration and testing of a maritime nuclear propulsion system.

Nuclear Marine Propulsion Project Gains Norwegian Funding

VARD Group, Vard Electro and Island Offshore are among the partners collaborating to develop and demonstrate a new generation of nuclear-powered marine propulsion technology The...

Related news