Latest NewsShip & Boat BuildingMed Marine Successfully Delivered The MV Pate To Kenya Shipyard

Med Marine Successfully Delivered The MV Pate To Kenya Shipyard

The contract signing ceremony for the supply and delivery of an Azimuth Stern Drive Tugboat with the Kenya Shipyard Limited took place on March 2022.

The vessel is MED-A3085 series, designed by Canadian Naval Architects Robert Allan exclusively for Med Marine and the delivery of the tug was facilitated to Kenya on 5th September.

Med Marine’s tugboat was chosen by Kenya Shipyard for its versatile, multi-purpose, compact and modern design which features efficient ship-handling, coastal towing, general-purpose towing and escort capabilities.

Vessel will be operated at Port Lamu in Kenya in order to meet the growing marine service requirements of Kenya Shipyard.

Vessels name was chosen as MV PATE.

The tugboat’s specifications:

LENGTH OVERALL                               29,70 m
BEAM, MOULDED                                13,30 m
DEPTH                                               5,45 m
DRAFT MAXIMUM                                6,00 m
GROSS TONNAGE                                481 GT
BOLLARD PULL                                    84 tons
SPEED                                                12 knots
MAIN ENGINE                                     CATERPILLAR 3516C
TOTAL POWER                                    2 x 2525 kW @ 1800rpm
EMISSION STANDARD                         IMO Tier II
AZIMUTHING STERN DRIVE                KONGSBERG US255P30 FP
PROPELLER                                        2800 mm diameter
SHAFTING                                          Composite Shaft
ACCOMMODATION                              8 people

Latest News

MacGregor has secured orders to supply deck cranes, cargo-handling equipment and deck machinery for four new oceanographic research vessels being built in Europe and India. Equipment deliveries are scheduled to begin in 2027, with the final deliveries due by the third quarter of 2029.

MacGregor Equipment for Four New Research Vessels

MacGregor will provide lifting and handling equipment for four new research vessels operating in demanding marine environments MacGregor has secured orders to supply deck cranes,...
Angola’s emerging shipbuilding sector has marked a significant milestone with the launch of the first multi-role patrol boat built by Kianda Shipyard in Luanda. The 16-metre TOMBWA 50 represents the Angolan yard’s first vessel in the class and highlights the growing role of regional expertise in developing southern Africa’s marine manufacturing capability.

Angolan Shipyard Launches First TOMBWA Patrol Boat

The first 16m TOMBWA 50 highlights Kianda’s growing capability to build aluminium vessels for patrol, survey and offshore operations Angola’s emerging shipbuilding sector has marked...
Offshore engineering specialist Osbit, part of Venterra Group, has secured a contract from Jan De Nul Group to design and build a next-generation shallow water trencher for cable burial operations.

Osbit Wins Jan De Nul Trencher Contract

Jan De Nul’s Next-generation trencher combines deep burial capability with a compact, containerised design. Offshore engineering specialist Osbit, part of Venterra Group, has secured a...
Fire Zone Antwerp (Brandweer Zone Antwerpen) has officially commissioned 'Schelde 112', a high-speed rescue vessel designed to strengthen emergency response capabilities along the 35km stretch of the Scheldt running through Antwerp.

Antwerp Adds High-Speed Rescue Boat

New rescue vessel provides Fire Zone Antwerp with faster, safer and more capable river rescue operations Fire Zone Antwerp (Brandweer Zone Antwerpen) has officially commissioned 'Schelde...

Related news