Latest NewsShip & Boat BuildingRobert Allan Celebrates Delivery Tug RAS ALHEKMA to the Egyptian Navy

Robert Allan Celebrates Delivery Tug RAS ALHEKMA to the Egyptian Navy

Naval architecture firm Robert Allan Ltd. is pleased to announce the successful delivery of the RAS ALHEKMA, a high-performance terminal support and escort RAstar 3200-W series tug, to the Egyptian Navy in Alexandria, Egypt.

Named after Ras Al-Hekma, a prominent cape along Egypt’s Mediterranean shoreline, the RAS ALHEKMA is the first in a series of five RAstar 3200-W series tugs being constructed at Alexandria Shipyard, marking a significant milestone in the ongoing collaboration between Robert Allan Ltd. and Egypt’s naval shipbuilding sector.

This RAstar 3200-W series tug was recently completed at Alexandria Shipyard and is the first of series of five that are being built in the yard. The RAstar escort series tug features unique sponsoned hull form developed exclusively by Robert Allan Ltd., which has been proven to provide significantly enhanced escort towing and seakeeping performance. All provide high bollard pull, power, manoeuvrability with the RAS ALHEKMA receiving positive feedback during trials from the owner including low noise levels of the tug due to noise treatments designed by this office and applied by the shipyard.

As one of the biggest shipyards in Africa and the Middle East area, Alexandria Shipyard carried out the production design by its own technical team. The encouraging finished product demonstrates the executive capability of the shipyard and Robert Allan Ltd. look forward to working with the builder for more projects for the coming years.

Main particulars of RAS ALHEKMA are:

  • Length overall (including fenders): 32.7 m
  • Beam, moulded: 13.2 meters
  • Depth, moulded: 5.5 meters
  • Gross tonnage: 498

The tug was designed and constructed to comply with all applicable Rules and Regulations of Bureau Veritas to the Class Notation:

Sea trial results showed that the 86 tonnes bollard pull and speed of 14.1 knots surpassed the owner’s performance requirements for this design.

About Alexandria Shipyard

Alexandria shipyard was established in 1962 inside the free zone of Alexandria port . ASY is a pioneer company in shipbuilding , ship repair and heavy industries in Egypt and the Middle East. The total yard’s land area is about 400,000 m2 with total quays length of 1200 m. Currently, the company is affiliated to the Marine industries & Services organization owned by the Egyptian Ministry of Defense. 

Latest News

Boluda Shipping and Samskip have signed an agreement for Boluda Shipping to acquire Samskip, paving the way for the creation of one of Europe’s most comprehensive short-sea shipping networks.

Boluda Shipping to Acquire Samskip

Boluda Shipping’s acquisition of Samskip will expand short-sea shipping connections between Northern Europe, the Iberian Peninsula, the Canary Islands and West Africa Boluda Shipping...
Inland and Coastal Marina Systems has supplied three heavy-duty concrete tug berth pontoons for the modernisation of the Tidal Basin at HM Naval Base Portsmouth, replacing ageing berthing infrastructure that had been in service for more than 40 years.

New Tug Berths for Portsmouth Naval Base

Three purpose-designed pontoons form part of a wider berthing upgrade delivered for KBS Maritime at HM Naval Base Portsmouth Inland and Coastal Marina Systems has...
SAFE Boats International, a US manufacturer of high-performance aluminium vessels for military, law enforcement and emergency response operations, has secured a five-year Blanket Purchase Agreement (BPA) valued at up to $36.4 million to support U.S. Southern Command (SOUTHCOM) Foreign Military Sales (FMS) programmes.

SAFE Boats Secures $36.4 Million Patrol Vessel Agreement

Five-year agreement will support US Foreign Military Sales programmes, with initial patrol vessel deliveries to four Caribbean nations scheduled from 2027 SAFE Boats International has...
Hydrex carried out temporary hull repairs on a 67-metre shallow-water barge during June, adapting its original repair plan to overcome challenging weather and sea conditions while maintaining safe working practices. The work was undertaken while the barge was in the Norderney and Delfzijl areas, with damage identified in void tanks 4 and 6.

Hydrex Adapts Repair Strategy for Barge Hull Repairs

Challenging sea conditions prompt Hydrex to adopt an alternative repair method for damaged sections of a barge hull Hydrex carried out temporary hull repairs on...

Related news