Power & PropulsionBattery TechnologyBrødrene Selects ZEM Battery System for Flagship Fjord Vessel

Brødrene Selects ZEM Battery System for Flagship Fjord Vessel

ZEM will deliver a 1.48 MWh battery system for a new Brødrene Aa-built vessel destined for UNESCO-listed Norwegian fjords

ZEM has secured a contract to supply its LFP Power battery system for a new flagship tourist vessel being built by Norwegian shipbuilder Brødrene Aa for ferry operator The Fjords DA.

The vessel is destined for service in Norway’s UNESCO-listed West Norwegian World Heritage fjords, where new regulations requiring passenger vessels under 10,000 GT to operate with zero emissions came into force on 1 January 2026.

Under the contract, ZEM will deliver a 1,480 kWh (1.48 MWh) LFP Power battery system based on lithium iron phosphate (LFP) chemistry. The system will be configured for Megawatt Charging System (MCS) connectivity, enabling high-power shore charging to support the intensive operating schedules typical of fjord sightseeing services.

The latest award builds on a long-standing collaboration between ZEM and Brødrene Aa, the Hyen-based shipbuilder renowned for its lightweight carbon-fibre passenger vessels. Brødrene Aa has previously delivered several pioneering low- and zero-emission vessels for The Fjords, including Vision of the Fjords, Future of the Fjords and Legacy of the Fjords.

“Delivering our LFP Power system for this vessel reflects the maturity of ZEM’s battery technology for demanding, high-utilization passenger operations. An MCS-ready 1.48 MWh system gives The Fjords the energy and the charging headroom to run a full sightseeing schedule with zero emissions in exactly the waters where it matters most.” — Jonathan Sørbye, CEO, ZEM AS

Latest News

Svitzer has taken delivery of another TRAnsverse 2900 tug from Cheoy Lee shipyard

Svitzer Takes Delivery of Another TRAnsverse 2900 Tug

The latest TRAnsverse 2900 tug delivery from Cheoy Lee’s Hin Lee shipyard adds to Svitzer’s expanding fleet as its 27-vessel newbuild programme continues to...
GONDAN Shipbuilders has secured a contract with AB Göteborg-Styrsö Skärgårdstrafik (Styrsöbolaget) to design and build three fully electric passenger catamarans for operation in Gothenburg’s southern archipelago.

GONDAN Wins Contract for Gothenburg Electric Ferries

The contract forms part of Styrsöbolaget’s long-term passenger transport commitment in Gothenburg’s southern archipelago, supporting the transition to fully electric ferry operations GONDAN Shipbuilders has...
Built by Uzmar Shipyard for Norwegian operator Buksér og Berging, the Bryteren is a compact ice-class tug designed to support ship-assist, towing and ice-management operations in demanding northern waters. Based on Robert Allan Ltd.’s TundRA 2200 design, the tug combines powerful towing capability with enhanced manoeuvrability and specialised cold-weather features, enabling it to operate reliably in challenging ice conditions.

New Ice-Class Tug ‘Bryteren’ Delivered to Buksér og Berging

Designed for operation in temperatures down to -25°C, the tug 'Bryteren' combines icebreaking capability, specialised winterisation and powerful propulsion Built by Turkish shipbuilder Uzmar Shipyard...
Muir Mhòr Offshore Wind Farm has secured offshore planning consent from the Scottish Government, paving the way for one of the world’s first commercial-scale floating offshore wind farms to be developed in Scottish waters. The approval marks a significant milestone for the flagship ScotWind project, which is planned for Scotland’s east coast, approximately 63km from Peterhead.

Scottish Floating Wind Farm Project Gets Green Light

The project has now received the green light, with both offshore and onshore planning approvals secured, paving the way for development of one of...

Related news