Latest NewsVessel Repair & MaintenanceCammell Laird Completes Record RFA Repairs

Cammell Laird Completes Record RFA Repairs

Cammell Laird’s defence division has welcomed five Royal Fleet Auxiliary (RFA) vessels simultaneously to its facility for vital maintenance work.

In the first five months of 2024, Cammell Laird has welcomed RFA Tideforce, RFA Tiderace, RFA Fort Victoria, RFA Proteus and RFA Stirling Castle.

Cammell Laird has provided in service support to the Royal Fleet Auxiliary under the Cluster support Contract since 2008. The team has supported vessels from the RFA Fort-Class, Wave-Class and Tide-Class. In 2023, RFA Proteus and RFA Stirling Castle were also added to the cluster.

Today the APCL Group maintains 100% of the RFA flotilla, with APCL company A&P Falmouth supporting RFA Lyme Bay, RFA Mounts Bay, RFA Cardigan Bay, RFA Argus together with HMS Scott.

RFA Tideforce is currently in drydock undergoing a full underwater blast and paint programme as well as her five year hull survey, main engines service and main generator overhauls. The vessel’s port CPP hub is also being removed for overhaul in the facility’s workshops. RFA Tiderace is undergoing maintenance under Cammell Laird’s care and protection base.

RFA Fort Victoria is undergoing the overhaul of her starboard main engine as well as the removal of her RAS equipment for overhaul at Kongsberg Marine.

RFA Proteus arrived earlier in the year for a complete overhaul of her propulsion systems and main engine. Cammell Laird also completed an extensive service and overhaul of the vessel’s deck crane, as well as completing her five-year DNV survey. RFA Proteus’ hull was also repainted – completed by APCL company Neway.

Stirling Castle, the latest addition to Cammell Laird’s cluster, is undergoing a 19-day maintenance period.

Cammell Laird is proud of the role it has played in supporting the RFA fleet.

Mike Hill, Managing Director, Cammell Laird Shiprepairers and Shipbuilders Ltd, said: “During the last 16 years, Cammell Laird has established a strong relationship with the RFA, supporting their flotilla.

“Our dedicated Cluster Support Team (CST), based on the River Mersey, has utilised our extensive knowledge and expertise to simultaneously complete each of the five vessel’s specific work scope.

“I am proud that the APCL Group are providing round-the-clock support to 100 per cent of the RFA flotilla, whilst at home and abroad, ensuring the optimum availability to the whole operational fleet.”

Latest News

Windward Offshore has taken delivery of Windward Hamburg, the fourth and final Commissioning Service Operation Vessel (CSOV) in its newbuilding series with VARD, completing a four-vessel fleet designed to support offshore wind projects from construction and commissioning through long-term operations.

Windward Offshore Takes Delivery of Fourth CSOV

Windward Hamburg joins three sister vessels to form Windward Offshore’s core CSOV fleet Windward Offshore has taken delivery of Windward Hamburg, the fourth and final...
Spanish shipbuilder AISTER has completed construction of two MZ12 PILOT pilot boats for Honduras’ National Port Authority (ENP), with the vessels now undergoing final sea trials in the Vigo estuary ahead of deployment in Honduras.

AISTER Completes Twin Pilot Boat build for Honduras

Spanish aluminium shipbuilder AISTER, has completed construction of two MZ12 PILOT pilot boats for Honduras’ National Port Authority (Empresa Nacional Portuaria ENP), with the...
Tidal Transit has deployed a Charge Qube battery energy storage system (BESS) from Fellten to support onshore charging for e-Ginny, the company’s landmark retrofit electric crew transfer vessel (E-CTV).

Tidal Transit deploys Charge Qube for e-Ginny

Fellten’s Charge Qube battery energy storage system provides shoreside charging support for Tidal Transit’s retrofit electric crew transfer vessel Tidal Transit has deployed a Charge...
JFA Naval has completed and delivered a new pilot boat for the Port of Sète in southern France, following the completion of a project originally initiated at Chantiers Bernard.

JFA Naval Delivers New Pilot Boat to Port of Sète

New pilot boat for the Port of Sète reaches 23 knots fully loaded following completion by JFA Naval JFA Naval has completed and delivered a...

Related news