Ship & Boat BuildingFerriesHumphree refit on high speed ferry – a great deal for our...

Humphree refit on high speed ferry – a great deal for our climate

The high speed catamaran passenger ferry MOLSLINJEN Express 1, built by Incat Tasmania in Australia, operates between Ystad, Sweden and Rönne, Denmark. Like most fast ferries, it is powered by large water jets. In general, water jets are efficient at high speeds while redirecting the flow to steer the ferry costs energy. At Rönne harbor, there is limited space between the piers when entering. The solution to improve the ferry’s steering performance was found at Swedish Humphree in Gothenburg and steering interceptors that provide additional maneuverability, efficient steering and improved course keeping which reduces the distance travelled between destinations.

When the Humphree system keeps the course stable at speed, passenger comfort on board increases. At the same time the CO2 savings are estimated to more than 1 000 tons per year, equaling an installation of solar panels on two football pitches in Scandinavia.

Categories:

Latest News

Lehmann Marine, a Sunlight Group company, has completed the full electrification of the MS SISSI passenger vessel, marking a further development in the adoption of battery-electric propulsion for inland waterway transport.

Lehmann Marine Powers Electric Conversion MS SISS

The 46.8-metre passenger vessel has been converted from diesel to fully electric propulsion, featuring a customised 2,000 kWh Lehmann Marine CUBE battery system for...
Työvene Oy has delivered CASTOR, a specialised SWATH (Small Waterplane Area Twin Hull) vessel, to the German Navy following her arrival at her home port of Neustadt in Holstein.

Työvene Delivers SWATH Vessel CASTOR to German Navy

Featuring a twin-hull SWATH design, CASTOR is engineered to deliver improved seakeeping and passenger comfort during naval personnel transfer operations Työvene Oy has delivered CASTOR,...
Ecowende has completed the installation of all 52 wind turbines at its offshore wind farm in the Hollandse Kust (west) wind farm zone, Lot VI, marking a major milestone in the project’s construction.

Final Turbine Marks Ecowende Construction Milestone

The final Vestas V236-15.0 MW turbine was installed on 30 October, completing the 52-turbine installation campaign in less than five months Ecowende has completed the...
Damen Shipyards has secured a contract with the Lithuanian Navy for the construction of a new Pollution Incident Response and Search and Rescue (SAR) vessel, based on Damens Offshore Patrol Vessel 6711 design.

Damen to Build Lithuanian Navy SAR Vessel

Based on Damen’s Offshore Patrol Vessel 6711 design, the multi-role Lithuanian Navy SAR vessel will provide enhanced search and rescue and pollution response capabilities Damen...

Related news