Port & HarbourGreen PortAssociated British Ports Announce Ambitious Plans For Port of Barrow

Associated British Ports Announce Ambitious Plans For Port of Barrow

Associated British Ports (ABP), the UK’s leading and best-connected port operator, has today announced its ambitious plans for the Port of Barrow, which is designed to drive growth and strengthen the local economy in response to a wave of significant investment coming to the region by 2040 and beyond.

The masterplan is the latest in a series of visionary plans pulled together by our RTPI-award winning internal masterplanning team. It describes how Barrow is poised to take advantage of significant long-term investment, driven by its crucial role in meeting the UK’s obligations under the AUKUS partnership and in achieving net zero emissions by 2050. ABP’s masterplan will ensure that the Port of Barrow is equipped to meet these challenges by expanding its capacity and capabilities across key sectors.

Bryan Davies, Divisional Port Manager (Northwest and Scotland) at ABP said: “ABP is proud to be part of Barrow’s future by helping to create the facilities needed to support the advanced engineering cluster. Our masterplan ensures that this development benefits not only the industry but also the local community and environment, and supports ABP’s wider sustainability strategy – Ready for Tomorrow.”

Michelle Scrogham MP for Barrow and Furness said: “ABP’s masterplan is a visionary blueprint for the future of Barrow. The focus on sustainable growth, along with the port’s role in supporting both advanced engineering and renewable energy, means this plan will have long-lasting benefits for our community. I am excited to see how these plans will deliver new opportunities for the people of Barrow.”

The masterplan sets out three core objectives that position the town as a leader in advanced engineering and renewable energy, while fostering community and environmental sustainability. These objectives focus on delivering growth capacity for:

  • the advanced engineering cluster
  • the net zero cluster
  • local businesses, communities and environments.

Under the first objective, which aims to help build Barrow’s capabilities in advanced engineering, ABP outlines how the port will respond to new demand created by the AUKUS deal, which will make it critical for the port to expand its capacity to support the manufacturing and shipping of submarine sections. ABP has been working alongside BAE Systems to transfer land that will allow a major increase in BAE Systems’ production capacity.

Then, ABP will be working on the first major project from the masterplan – the Barrow EnergyDock – which will soon be going to public consultation. This project will set the stage for a significant shift in green energy capacity primarily intended for Barrow’s advanced engineering sector. The Barrow EnergyDock floating solar project would be a pioneering initiative designed to meet the growing demand for zero-carbon energy. The project proposes a floating solar array in Cavendish Dock, which can generate up to 32 MWp of green electricity, enough to power the equivalent of 10,300 homes each year.

Kirsten Abbott, Commercial Manager (Energy) at Associated British Ports said: “ABP is incredibly excited about the Barrow EnergyDock project, which marks a major step toward meeting the green energy needs of Barrow’s industries, and positioning Barrow as a forward-thinking industrial hub.

“ABP is committed to working closely with the Council, local stakeholder and the public to ensure that the Barrow EnergyDock project benefits the entire community. A public consultation on the project will begin shortly, giving local residents and businesses the opportunity to engage with this transformative initiative.”

The second objective focuses on how the port will play a role in boosting the UK’s wider journey to energy security and net zero. Barrow has already established itself as a key player in the offshore wind industry, serving as a home to five Operations & Maintenance (O&M) bases. ABP is planning for the construction of new O&M bases to accommodate the growing offshore wind sector, along with berths capable of handling larger Service Operation Vessels (SOVs). One such development is the Walney Channel O&M Base, where ABP has identified 4.7 acres of land adjacent to Ramsey Way. This site will provide the facilities necessary to support future wind energy projects, including warehousing, crew facilities, and marine access points for SOVs and Crew Transfer Vessels (CTVs).

Alongside these O&M facilities, we expect to provide facilities for the construction process of the windfarms themselves, supporting the expected £17 billion investments in wind energy expected to come to the Eastern Irish Sea under the Round 4 process. The expansion of these facilities will ensure that Barrow remains a leading hub for wind energy, anchoring high-skill jobs and growth in the local economy.

In addition, the masterplan includes exciting new proposals for maritime connections to support hydrogen import and carbon storage. As part of its broader commitment to achieving net zero, ABP has undertaken early feasibility studies on developing a new jetty capable of accommodating incoming gas carrier vessels up to 200m in length and with a capacity of 25,000 cubic metres. This jetty would be an essential piece of infrastructure will help to position Barrow as a key player in the UK’s energy transition.

The third objective sets out Associated British Ports specific plans to reinforce the local economy while moving to net zero, building biodiversity and strengthening communities. ABP wishes to contribute to stakeholders’ wider efforts to make Barrow a more attractive place to live and work. This includes supporting proposals a new ‘Skills Quarter’ for the town and the Barrow Marina Village project, while maintaining ABP’s wider community work such as the main sponsors of the annual Barrow Tall Ships event.

Cllr Jonathan Brook, Leader of Westmorland and Furness Council and Cabinet member for the economy welcomed the masterplan and called for collaboration to bring it to life: “This ambitious plan will be key to unlocking Barrow’s potential. The Council is committed to working closely with ABP and other stakeholders to make this vision a reality. By joining forces, we can ensure that Barrow thrives and delivers benefits that will be felt across the region for generations to come.”

Associated British Ports masterplan for the Port of Barrow is a call to action for all stakeholders in Barrow to work together to ensure that the town not only adapts to new opportunities ahead, but thrives as well. With its commitment to enhancing engineering, renewable energy and sustainable growth, the Port of Barrow is set to become a critical driver of long-term prosperity for the region.

Latest News

LD Armateurs Group has taken delivery of the DP2 multipurpose support vessel TVO Mariner, strengthening the Group’s fleet and expanding the offshore capabilities of its subsidiary LD TravOcean, which specialises in subsea cable installation and protection.

LD Armateurs Takes Delivery of DP2 Vessel TVO Mariner

DP2 multipurpose support vessel TVO Mariner, expands LD TravOcean’s capabilities across subsea cable, telecommunications and offshore wind projects LD Armateurs Group has taken delivery of...
PaxOcean Group, a member of Kuok Maritime Group, and Ulstein Design & Solutions AS have signed a contract for the design and construction of a new ULSTEIN SX222 Service Operation Vessel (SOV) for NYK Line (Nippon Yusen Kabushiki Kaisha).

NYK Selects ULSTEIN SX222 for New Offshore Wind SOV

PaxOcean and Ulstein join forces to deliver NYK’s next-generation offshore wind SOV PaxOcean Group, a member of Kuok Maritime Group, and Ulstein Design & Solutions...
Dutch winch specialist Dijvler is expanding into the sea-going vessel market following the acquisition of the rights, designs, drawings and certifications of C-Nautical, enabling the company to launch a new standardised range of anchor and mooring winches for cargo vessels and offshore support vessels. With nearly 50 years of experience supplying anchor and mooring winches for inland waterway vessels, Dijvler is now applying its established engineering expertise to the wider commercial marine sector. The company expects to deliver its first orders for the new programme in 2027.

Dijvler Targets Sea-Going Vessels With New Winch Range

Dutch winch specialist Dijvler, builds on nearly 50 years of inland vessel experience with a new standardised range for cargo and offshore support vessels Dutch...
Safehaven Marine has launched Ederra 8, an 18-metre Interceptor 60 pilot boat built for the MVD Pilots Association in Montevideo, Uruguay. The vessel is the third pilot boat Safehaven Marine has built for the Montevideo pilots and the fourth vessel supplied to the organisation overall. The latest delivery follows the Ederra 6 and Ederra 7, two Interceptor 48 pilot boats delivered in 2022, which have been operating successfully with the pilots over recent years.

Safehaven Marine Launches Interceptor Pilot Boat Ederra-8

Safehaven Marine has launched Ederra 8, an 18-metre Interceptor 60 pilot boat built for the MVD Pilots Association in Montevideo, Uruguay https://youtu.be/a7ImyS0Er70?si=glEf4QIrKSlrVSZk Safehaven Marine has launched...

Related news